Monday, June 1, 2015

Taped and polybrushed!

Inspection hole doillies and all gussets on as well.

Saturday, May 30, 2015

Glueing the fabric to the ribs

50/50 polytac and MEK through the fabric onto 100 percent polytac dried on the ribs