Monday, June 1, 2015

Taped and polybrushed!

Inspection hole doillies and all gussets on as well.

Saturday, May 30, 2015

Glueing the fabric to the ribs

50/50 polytac and MEK through the fabric onto 100 percent polytac dried on the ribs

Monday, February 16, 2015

Heat shield on the bottom

We added an eighth inch ceramic mat under a very thin stainless steel sheet.  Hopefully this will prevent exhaust heat from leeching up through the bulkheads which are riveted to the bottom skin.

Endless filling and sanding